Client: Public Utilities Board (PUB)

Main Contractor: Jurong Primewide Pte Limited

Project Details:

NEWater Service Reservoir Phase 1, located at Mandai Hill 68, encompassed the construction of a fully covered R.C. tank structure with an internal diameter of 100m and an elevated height of 15m for storage of recycled water (NEWater) which is void of minerals and “hungry” for salts.

The design requires a concrete corrosion protection HDPE liner of thickness 5mm (blue color) that can be cast-in-placed directly against all internal concrete structures which include columns, internal staircases, walls, walkways and floors.

Green Cosmos supplied 15,000m2 of the required HDPE anchor know sheet (AKS), prefabricated  to the required formwork dimensions and field welded the cast-in-place stud liner panels including 100% QA/QC seam testing using high voltage holiday detector spark tester.

 

Overview of NEWater Service Reservoir at Mandai Hill 68

Internal structures lined with AKS liner 5mm thick

Access walkways and overflow structure fully lined

Access stairways and columns fully lined with AKS 5mm thick

Close-up view on lined column and beam structures

Final clean-up of AKS lined NEWATER Service Reservoir before handover to PUB

Please publish modules in offcanvas position.