Year 1995 –  Foundation laid as Green Cosmos Marketing specializing in the supply and installation of geosynthetics
Year 1997 –  Company expanded and Green Cosmos Marketing Pte Ltd was incorporated to cover regional markets in South East Asia
Year 1998 –  Undertake major environmental lining works at Pulau Semakau Offshore Landfill
Year 1999 –  Spearheaded the very first soil improvement works (“PVD”) for two (2) JBIC-funded reclamation and coastal highway construction projects in Cebu City, Philippines
Year 2002 Kick-started the first DTSS Seletar Link Sewers PUB Project using AKS HDPE corrosion protection liner (“CPL”) for internal lining (330⁰) of precast RC jacking pipes
Year 2003 –  Gained entry into Vietnam and undertake design/build package involving the construction of HDPE/LLDPE geomembrane floating covers for World Bank funded “Three Cities Sanitation Project” located in Da Nang City
Year 2004 -   Secured PUB DTSS Phase 1 Contract T06 Queensway Tunnel to undertake CPL works for internal lining of tunnels, shafts, adits and chambers
Year 2006 –  Awarded Phase 1 (45ha) environmental lining system and landfill construction at Da Phuoc Integrated Waste Treatment Facilities located in Ho Chi Minh City, Vietnam
Year 2008 –  Undertake soil improvement works (PVDs and PHDs) for JICA-funded project at Cai Mep International Container Terminal located in Ba Ria-Vung Tau Province, 70km from Ho Chi Minh City, Vietnam
Year 2009 –  Constructed soft rock revetments and seawall for restoration of shorelines at East Coast Park and Pasir Ris Park using sand-filled geotextile containers (0.75m3) with vandal deterrent composite fabrics
Year 2010 –  Completed internal lining of fully covered RC tank structures (⦱ 100m) for  PUB NEWater Service Reservoir at Mandai Hill 68 using 5mm thick blue colour AKS HDPE concrete protection liners
Year 2011 –  Designed and built mechanically stabilised earth (“MSE”) walls with green facings at Garden By The Bay, Marina South using high strength reinforcement geogrids
Year 2013 –  Deployed specialized excavator-mounted hydraulic winch machinery to undertake field installation of PVDs for HDB Reclamation at Pulau Ubin and Pulau Tekong (Part 1) Changi East Finger Extension. A total of 10.8 million linear metres of PVDs were installed 5 months ahead of schedule
Year 2016 –  Accomplished yet another major soil improvement works (PVD) at JTC Jurong Island Westward Extension reclamation scheme. Under Phase 1 and Phase 2, a total of 27 million linear metres of PVDs were installed and successfully completed in May 2016

 

Please publish modules in offcanvas position.